• Skip to content
  • Skip to navigation
Logo: Rotherham Metropolitan Borough Council
Your Account
  • Menu
Close menu
Close
  • About the Council
  • Business and Economy
  • Children and Families
  • Community and Living
  • Council Tax and Benefits
  • Education and Learning
  • Environment and Waste
  • Health and Social Care
  • Housing
  • Jobs and Careers
  • Leisure and Culture
  • Planning and Development
  • Transport and Streets
  • See all news
  • See all events
  1. Home
  2. Latest news
  3. Work starts on ‘green corridor’ in Greasbrough

Work starts on ‘green corridor’ in Greasbrough

Work starts on ‘green corridor’ in Greasbrough
Cllr Elliott and Cllr Allen at the site

Work has begun to improve links between Greasbrough’s green spaces as part of a £4 million package to restore pride in the borough’s towns and villages.

The project is the first of 23 schemes to be implemented across the borough over the next two years as part of Rotherham Council’s pledge to invest in smaller towns and village centres as part of its Towns and Villages Fund (TVF).

The Greasbrough scheme will link two well-used green spaces; Green Flag Award winning Greasbrough Park and the nearby Recreation Ground with the creation of a new green corridor.

The new development will be named ‘Brimmagen Fold’, which is based on historic mapping, and will include a new feature entrance with seating, widened footpaths to improve accessibility, tree planting and railings to deter vehicles from entering the green space.

The works will also make better use of the currently underutilised green space between the two sites to make trips between the park and recreation ground safer and more pleasant for visitors.

The TVF money has been specifically earmarked for areas of the borough which are not being supported through national Government funding schemes, such as Levelling up and Towns Fund monies.

Since the Council funding was confirmed, local councillors have been working with their communities to draw up a wish list of sites they want to see improved.

Councillor Sarah Allen, Deputy Leader and Member for Greasbrough Ward, said: "In their role as community champions, our members have been engaging with the local community to identify the parts of the ward that could benefit from this scheme.

“The improvements will not only enhance these much loved and well used green spaces, but better accessibility as a result of the new link will mean both local residents and visitors can visit both areas easily.”

In total, the Council is working towards implementing 23 separate schemes of a similar scale across the borough over the next two years.

TVF money is also being set aside for larger scale improvements on Maltby High Street, which it is hoped can be used to lever in further external funding.

Published: 19th April 2022

Share on

  • Share on Facebook
  • Share on LinkedIn
  • Share on Twitter

Stay connected

Sign up for our newsletter
Footer Logo: Rotherham Metropolitan Borough Council
  • About this website
  • Accessibility statement
  • Privacy
  • Languages
  • Contact Us
  • Location
  • Terms and conditions
  • Facebook logo
  • Twitter logo
  • YouTube logo
  • Instagram logo
  • LinkedIn logo

All content © 2025 Rotherham Metropolitan Borough Council. All Rights Reserved.

Designed and Powered by Jadu.

chatbot launch button image
Left Right
Full Wide Split Narrow
Chatbot avatar image
Hi, I'm Bailey
I'm here to answer your questions.

Hi, I'm Bailey, how can I help you today? You can ask me questions relating to a number of council services.

To start a chat you will need to click 'continue' to confirm you have read and understood our terms and conditions Privacy Policy.

Privacy Statement