  1. Home
  2. Environment and waste
  3. Nature and conservation
  4. Tree Management Protocol & Guidance

Tree Management Protocol & Guidance

In this section

  1. Common Issues and Enquiries
  2. Contents
  3. Introduction 1.1 - 1.3
  4. 2.1 A Guide to Trees & Woodlands in Rotherham
  5. 2.2 Protocol & Guidance for Effective Tree Management 2.2.1 - 2.2.5
  6. 2.2 Protocol & Guidance for Effective Tree Management 2.2.6 - 2.2.7
  7. 2.2 Protocol & Guidance for Effective Tree Management 2.2.8 - 2.2.9
  8. 2.2 Protocol & Guidance for Effective Tree Management 2.2.10 - 2.2.13
  9. 2.3 Community Engagement
  10. 3. Ash Dieback
  11. 4. Review
  12. You are here: Evidence of Indirect Damage to Property

Evidence of Indirect Damage to Property

For full information about the Association of Tree Officer’s Risk Limitation Strategy, please visit: https://ltoa.org.uk/resources/risk-limitation-strategy

The following information will be required to prove subsidence damage has been caused by a Council owned tree.  The level of information required will depend upon the relative value of the tree and therefore the benefits it provides to the local area:

Low Value Tree: A low value tree that could be removed and replaced.

Site Information

  • Report on damage to building.
  • Plan and profile of foundations.
  • Plan of site showing location of building in relation to all trees and significant vegetation in the vicinity of the site.

Test Results

  • Trial pit cross section to underside of foundation depth plus borehole through base of trial pit to a minimum depth of 3m (explanation to be provided if borehole unable to reach 3m depth). Borehole log to be provided.
  • Root ID from beneath underside of foundation.

Medium Value Tree: A medium value tree that makes an important contribution to the area.

Site Information

  • The same site information is required as with Low Value Trees.

Test Results

  • The same test results are required as with Low Value Trees, plus:
  • Soil moisture content readings at 0.5m centres, starting at the underside of the foundation, down to 3m depth of B/H.
  • Liquid limit test results at underside of foundation and approx. 2m depth.
  • Plastic limit test results at underside of foundation and approx. 2m depth.
  • Soil plasticity calculated from LL – PL.
  • Control borehole to 3m depth with log, with same tests as above, if it is possible to locate such a borehole on the site and remote from the influence of any vegetation. If impossible then explanation needed.
  • Oedometer or suction test results at underside of foundation & 1.0m centres down depth of 3m borehole ONLY when there is NO control borehole. If there is a control borehole then other tests listed are sufficient.
  • Shear vane test results at 0.5m centres, starting at the underside of the foundation, down to 3m depth of borehole(s).
  • CCTV & hydraulic testing to drains (excluding Water Board owned) located within 3m distance of area of subsidence damage. If unable to water test due to no access/blind entries/etc then give reason.
  • Crack monitoring is required on a 6 weekly frequency and is to be set up ideally at time of first visit by building insurer representative or within 7 days of 1st visit. Send all available readings with Submission of Evidence.

High Value Tree: A high value tree that makes an extremely important contribution to the area.

Site Information

  • The same site information is required as with Low and Medium Value Trees.

Test Results

  • The same test results are required as with Low and Medium Value Trees, excluding crack monitoring.  In its place the following information will be required:
  • Control borehole (if possible) & point of subsidence borehole, each to 5m depth (not 3m as for medium value).
  • Level monitoring commencing at outset of claim for a relevant period (max. 12 months) using a deep datum (if possible) to 8m depth, otherwise use deep manhole.
  • Particle Size Distribution Analysis to BS 1377 Part 2 test 9.0 on a single soil sample taken from a 1m zone below the underside of foundation (Only if drains are present within 3m of the site of damage).
  • Previous page: 4. Review

Stay connected

Sign up for our newsletter
Footer Logo: Rotherham Metropolitan Borough Council
  • About this website
  • Accessibility statement
  • Privacy
  • Languages
  • Contact Us
  • Location
  • Terms and conditions
  • Facebook logo
  • Twitter logo
  • YouTube logo
  • Instagram logo
  • LinkedIn logo

All content © 2025 Rotherham Metropolitan Borough Council. All Rights Reserved.

Designed and Powered by Jadu.

chatbot launch button image
Left Right
Full Wide Split Narrow
Chatbot avatar image
Hi, I'm Bailey
I'm here to answer your questions.

Hi, I'm Bailey, how can I help you today? You can ask me questions relating to a number of council services.

To start a chat you will need to click 'continue' to confirm you have read and understood our terms and conditions Privacy Policy.

Privacy Statement